Acronyms
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z |
- Architecture Description Document
- Active Galactic Nuclei
- American Geophysical Union
- Astronomical Institute of Berne (Switzerland)
- Agenzia Spaziale Italiana (Italian Space Agency)
- Authority to Operate
- International Bureau of Weights and Measures
- Bundesamt für Kartographie und Geodäsie (Germany)
- Consequence
- Command and Data Handling
- Central Bureau
- Current Best Estimate
- Configuration Control Board
- Configuration Change Request
- Crustal Dynamics Data Information System (USA)
- Contract Data Requirements List
- Center for Astrophysics (USA)
- Code of Federal Regulations
- Configuration Management
- Centre National d’Etudes Spatiales (France)
- Center of Mass
- Communications Security
- Concept of Operations
- Continental United States
- Contracting Officer's Representative
- Commercial Off-the-Shelf
- Chief Safety and Mission Assurance Officer
- Conventional Terrestrial Reference System
- Document Change Notice
- Deutsches Geodätisches Forschungs Institut (Germany)
- Doppler Orbitography and Radiopositioning Integrated by Satellite
- Deputy Project Manager
- Data Information Services
- Discrepancy Report
- Export Administration Regulation
- European Data Center
- End-to-End Test
- European Geophysical Union
- Earth Orientation Parameter
- Earth Observing System (USA)
- Earth Observing System Data and Information System (USA)
- Engineering Peer Review
- Earth Rotation Parameter
- European Space Agency
- Earth Science Directorate
- Earth Science Data and Information System (USA)
- ESA Space Operations Center
- Earned Value Management
- Federal Aviation Administration
- Formulation Authorization Document
- Formulation Authorization Letter
- Factory Acceptance Test
- Final Acceptance Review
- Finite Impulse Response
- Field Programmable Gate Array
- Full Time Equivalent
- Full width half max
- Fiscal Year
- Geoscience Australia
- Government Furnished Equipment
- GeoForschungsZentrum (Germany)
- Goddard Geophysical and Astronomical Observatory (USA)
- Global GNSS Network
- Global Geodetic Observing System
- Global’naya Navigatsionnay Sputnikovaya Sistema
- Goddard Mission Services Evolution Center
- Global Navigation Satellite System
- Goddard Policy Directive
- Goddard Procedural Requirements
- Global Positioning System
- Goddard Space Flight Center (USA
- Ground Systems and Mission Operations Contract
- Gimbal and Telescope Assembly
- High Earth Orbiting
- Headquarters
- NASA Headquarters
- Integration and Test
- International Association of Geodesy
- Integrated Baseline Review
- Interface Control Document
- Information / Configuration Management Plan
- International Coordination and Partnership Office
- International Celestial Reference Frame
- International Celestial Reference System
- Indefinite Delivery Indefinite Quantity
- International DORIS Service
- International Earth Rotation and Reference Systems Service
- Institut Geographique National (France)
- Instituto Geográfico Nacional (Spain)
- International GNSS Service
- Integrated Geodetic Site Operations Center
- In-House Cost Estimate
- Integrated Independent Review Team
- International Laser Ranging Service
- Integrated Master Schedule
- Input / Output (aka IO)
- Integrated Product Team
- Independent Review Board
- Interface Requirements Document
- Information Technology
- International Traffic in Arms Regulations
- International Terrestrial Reference Frame
- International Terrestrial Reference System
- International Union of Geodesy and Geophysics
- International VLBI Service for Geodesy and Astrometry
- Japan Aerospace Exploration Agency
- Joint Center for Earth Systems Technology (USA)
- Joint Cost and Schedule Confidence Level
- Jet Propulsion Laboratory (USA)
- Key Decision Point
- Kalman Earth Orientation Filter
- kiloHertz
- Kōke'e Park Geophysical Observatory
- Likelihood
- LAser GEOdynamics Satellite
- Life Cycle Cost
- Life Cycle Cost Estimate
- Low Earth Orbiting
- Lessons Learned Committee
- Lunar Laser Ranging
- Low Noise Amplifier
- Length Of Day
- Level of Effort
- Lunar Orbiter Laser Altimeter
- Laser Ranging
- Laser Ranging Retroreflector Array
- Lunar Reconnaissance Orbiter
- Lunar Reconnaissance Orbiter Laser Ranging
- Mission Assurance
- Mission Assurance Requirement
- Microwave Amplification by Stimulated Emission of Radiation
- McDonald Observatory
- Monitor and Control Infrastructure
- MicroChannel Plate PMT
- Mission Concept Review
- Mission Definition Review
- Meteorological
- McDonald Geodetic Observatory
- Military
- milliJoule
- McDonald Laser Ranging System (USA)
- millimeter
- MOBile LASer Ranging System
- Mission Operations Review
- milliRadian
- Mission Support Office
- Monthly Status Review
- National Aeronautics and Space Administration (USA)
- Ny-Ålesund Geodetic Observatory
- Next Generation Satellite Laser Ranging
- NASA Handbook
- New Obligation Authority
- National Oceanic and Atmospheric Administration (USA)
- Network Operations Center
- NASA Policy Directive
- NASA Procedural Requirement
- Normal Point
- National Research Council
- U.S. Naval Research Laboratory
- NASA Space Geodesy Network
- Operations and Maintenance
- Next Generation GPS Ground Segment for Air Force
- Original Equipment Manufacturers
- Other Government Agency
- Office of Management and Budget
- Operational Security
- Operational Readiness Review
- Preliminary Design Review
- Polyphase Filterbank
- Photonics Industiries
- Program Level Requirements Appendix
- Project Manager
- PhotoMuliplier Tube
- Point of Contact
- Precision Orbit Determination
- Program Planning and Budget Execution
- Pulse Per Second
- Purchase Request
- picoseconds
- Pre-Shipment Review
- Periodic Technical Review
- Quad Ridge Flared Horn
- Quarterly Status Review
- Range Control Electronics
- ROACH Digital Back End
- Repetition
- Radio Frequency
- Request For Action
- Request for Information
- Request for Proposal
- Receiver Independent Exchange format
- Reliability, Maintainability and Availability
- Root Mean Square
- Reconfigurable Open Architecture Computing Hardware
- Requirements Tractability Matrix
- Robotic Total Station
- Safety and Mission Assurance
- Smithsonian Astrophysical Observatory (USA)
- System Acceptance Review
- Site Acceptance Test
- System for Administration, Training, and Educational Resources for NASA
- Space Communications Network Services Contract
- Systems Engineering
- Systems Engineering and Integration
- System Equivalent Flux Density
- System Engineering Management Plan
- Space Exploration Network Services and Evolution Contract
- Space Geodesy
- Space Geodesy Network
- Space Geodesy Network Operations Center
- Space Geodesy Project
- Space Geodesy Satellite Laser Ranging
- Stinger Ghaffarian Technologies, Inc. (USA)
- System Integration and test
- Software Independent Exchange Format
- Satellite Laser Ranging
- Safety and Mission Assurance Plan
- Science Mission Directorate
- Subject Matter Expert
- Software Management Plan
- Statement of Work
- Standard Product 3 (satellite orbit format)
- Software Quality Assurance Plan
- System Requirements Document
- Square-root information filter
- Systems Review Office
- Systems Requirements Review
- SigmaSpace Receiver
- Standard
- Support and Test Equipment
- Structural, Thermal, Optical
- Software Correlator
- To Be Determined
- To Be Supplied
- Transportable Laser Ranging System
- Terms of Reference
- Transmit / Receive
- Terrestrial Reference Frame
- Technology Readiness Levels
- Unallocated Future Expenses
- User Local Equipment
- University of Maryland Baltimore County (USA)
- United States Naval Observatory
- Universal Time
- Verification and Validation
- VLBI Global Observing System
- Very Long Baseline Interferometry
- Vector Tie System
- Work Breakdown Structure