NASA will be performing network maintenance on Monday, March 10, 2025, between 10:00 AM EDT and 10:30 AM EDT (14:00 to 14:30 UTC). There will be a few periods of disruption. This will result in the of the unavailability of the SGP website during these periods. If you experience problems outside this window, contact support-cddis@nasa.gov.

close window

Site Documentation

Baseline Reports

Requirements for Core geodetic sites were developed by NASA and GGOS. The latest GGOS Requirements for Core Sites can be found here. The following documents describe the evaluation of several current and former NASA VLBI and SLR sites for their potential to become Core sites.

Local Tie Surveys